2017 | XSite Modular

Interview with Amy Marks: Advancing Prefabrication 2018

As an MMC consultant, what are the main challenges that you see stakeholders facing with regards to off-site work in the current market? Prefabrication techniques and expertise are growing in the market, but what’s holding the industry back are internal roadblocks. The current processes of how construction companies conceptualize, estimate, and procure work preclude the

Read More...

Achieving Design and Construction Success with Prefabrication

Amy Kulka-Marks, USA Prefabrication Expert, Off-Site Program Manager and Singapore Government IPE Appointee, Appearing in Bangkok, Thailand from Wed, May 3 until Fri, May 5 ​ Apart from her riveting and high-energy keynote presentation, Ms Kulka-Marks will be leading an unmissable full-day interactive workshop. The morning session will explore the off-site continuum, and impart key

Read More...

Article: Manufactured Assemblies

The world of prefabricated construction goes beyond the washroom pods and classroom modules that often first come to mind— “pods and mods” as Amy Marks, president of XSite Modular, put it at a recent symposium organized by PCL to launch their expanded facility. Instead, says Marks, there’s a continuum of off-site construction methods. These range

Read More...

Scaling New Heights in Building Technology Using Prefabrication

USA Prefabrication and Modern Methods of Construction Expert Amy Kulka-Marks appearing as conference chairman and keynote speaker in Sydney, Australia, from Tue Feb 28 until Thu Mar 2. ​ Modular construction and prefabrication provides cost and schedule certainty, while drastically reducing on-site man-hours, by removing significant work from the building site and enabling a concurrent

Read More...
X